Interface: Washoe County Connected Vehicle Roadside Equipment - Commercial Vehicles

Washoe County Connected Vehicle Roadside Equipment to Commercial Vehicles Interface Diagram

Architecture Flow Definitions

intersection geometry  (Planned)  Applicable ITS Standards

The physical geometry of an intersection covering the location and width of each approaching lane, egress lane, and valid paths between approaches and egresses. This flow also defines the location of stop lines, cross walks, specific traffic law restrictions for the intersection (e.g., turning movement restrictions), and other elements that support calculation of a safe and legal vehicle path through the intersection.

intersection status  (Planned)  Applicable ITS Standards

Current signal phase and timing information for all lanes at a signalized intersection. This flow identifies active lanes and lanes that are being stopped and specifies the length of time that the current state will persist for each lane. It also identifies signal priority and preemption status and pedestrian crossing status information where applicable.

local signal priority request  (Planned)  Applicable ITS Standards

Request from a vehicle to a signalized intersection for priority at that intersection. This flow also allows the vehicle to cancel a priority request (for example, when the vehicle clears the intersection).

signal priority status  (Planned)  Applicable ITS Standards

In response to a request for signal priority, this flow indicates the status of the priority or preemption request.

vehicle location and motion  (Planned)  Applicable ITS Standards

Data describing the vehicle's position, heading, speed, acceleration, transmission, steering wheel angle, braking status, size information, and trajectory.