Interface: Washoe County Field Equipment - Washoe County Connected Vehicle Roadside Equipment

Washoe County Field Equipment to Washoe County Connected Vehicle Roadside Equipment Interface Diagram

Architecture Flow Definitions

barrier system control  (Planned)  Applicable ITS Standards

Information used to configure and control barrier systems that are represented by gates, barriers and other automated or remotely controlled systems used to manage entry to roadways.

barrier system status  (Planned)  Applicable ITS Standards

Current operating status of barrier systems. Barrier systems represent gates, barriers and other automated or remotely controlled systems used to manage entry to roadways. Status of the systems includes operating condition and current operational state.

environmental sensor data  (Planned)  Applicable ITS Standards

Current road conditions (e.g., surface temperature, subsurface temperature, moisture, icing, treatment status) and surface weather conditions (e.g., air temperature, wind speed, precipitation, visibility) as measured and reported by fixed and/or mobile environmental sensors. Operational status of the sensors is also included.

environmental sensors control  (Planned)  Applicable ITS Standards

Data used to configure and control environmental sensors.

incident scene warning notification  (Planned)  Applicable ITS Standards

Notification of an incident scene emergency or safety issue. This flow identifies that an incident scene emergency or safety issue has occurred so that warnings may be generated by more than one system in the work zone.

intersection control status  (Planned)  Applicable ITS Standards

Status data provided by the traffic signal controller including phase information, alarm status, and priority/preempt status.

roadway dynamic signage data  (Planned)  Applicable ITS Standards

Information used to initialize, configure, and control dynamic message signs. This flow can provide message content and delivery attributes, local message store maintenance requests, control mode commands, status queries, and all other commands and associated parameters that support remote management of these systems.

roadway dynamic signage status  (Planned)  Applicable ITS Standards

Current operating status of dynamic message signs, highway advisory radios, or other configurable field equipment that provides dynamic information to the driver.

signal preemption request  (Planned)  Applicable ITS Standards

Direct request for preemption to a traffic signal controller that results in preemption of the current control plan and grants right–of–way to the requesting vehicle. This flow identifies the required phase and timing of the preemption. This flow may also cancel the preemption request (e.g., when the requesting vehicle clears the intersection).

signal priority service request  (Planned)  Applicable ITS Standards

A service request for vehicle priority issued to a traffic signal controller that results in green extension or other accommodation for the priority vehicle, within the current signal timing plan. The request includes the priority level, the desired time and duration of service, and the intended travel path through the intersection. This flow also allows the RSE to cancel a previously issued request for priority.

traffic situation data  (Planned)  Applicable ITS Standards

Current, aggregate traffic data collected from connected vehicles that can be used to supplement or replace information collected by roadside traffic detectors. It includes raw and/or processed reported vehicle speeds, counts, and other derived measures. Raw and/or filtered vehicle control events may also be included to support incident detection.

vehicle signage local data  (Planned)  Applicable ITS Standards

Information provided by adjacent field equipment to support in–vehicle signing of dynamic information that is currently being displayed to passing drivers. This includes the dynamic information (e.g., current signal states, grade crossing information, local traffic and road conditions, detours, advisories, parking availability, etc.) and control parameters that identify the desired timing, duration, and priority of the signage data.

work zone warning notification  (Planned)  Applicable ITS Standards

Notification of a work zone emergency or safety issue. This flow identifies that a work zone emergency or safety issue has occurred so that warnings may be generated by more than one system in the work zone.